Load calculator

NEC load calculations for dwellings and commercial services.

The load calculator builds an NEC Article 220-style load calculation for a dwelling or commercial building and turns it into a PDF you can hand to a customer or inspector. This page covers creating, editing and sharing a calculation.

Watch a demo

Where to start

  • In your dashboard. Click Load calculations in the left menu. Calculations made here are saved to your account.
  • The free calculator. Anyone can try the free load calculator without signing in. You need a free account (no credit card) to unlock the final calculation and get the PDF.

If you already have an account, use the dashboard. When you are signed in to your shop, the free calculator opens a new load calculation in your dashboard for you.

Create a load calculation

  1. Go to Load calculations and click New.
  2. Enter the property address.
  3. Choose Dwelling or Commercial with the toggle next to the section title.
  4. For a dwelling, pick a Calculation method: Optional - NEC 220 Part IV, 2017 Standard - NEC 220 Part III, 2020/23 Standard - NEC 220 Part III, 2026 Optional - NEC 120 Part IV or 2026 Standard - NEC 120 Part III. Then set the Nominal voltage, Number of dwellings and Dwelling condition.
  5. For a commercial building, set the Property condition, Occupancy type, Nominal voltage and NEC version.
  6. Work through each load section below. Click Add equipment to add a line.
  7. Check the Final calculation at the bottom, then click Create load calculation.

For equipment that is not in the list, click Add equipment, then Add a line with your own values.

Edit a load calculation

  1. Open the calculation from Load calculations.
  2. Click Edit and make your changes.
  3. Click Save and view. You can also press Ctrl+S (Cmd+S on a Mac) to save and keep editing.

On a free account, Edit on a saved calculation offers a one-time free edit for 3 hours. An account gets one, for any one saved document. After that, editing needs a paid plan.

Share, download or print

Open the calculation and use the buttons at the top: Share, Download or Print. Share gives you two options:

  • Invite team member to edit adds that person to your account.
  • Send PDF via email only emails a PDF copy. Type the address and click Share PDF. Nothing changes on your account or bill.

Free plan and Commercial features

  • A free account can create 2 load calculations, and can edit one saved document free, one time, for 3 hours. After that you need a paid plan.
  • Commercial calculations, commercial and 3-phase voltages, and buildings with more than 4 dwelling units need the Commercial Pro plan. See pricing.

Recover or copy a document

Use Version history in the editor on the web to restore an earlier saved version, or Duplicate in the document's ⋯ menu in the list to make a separate copy. For a missing document, check archived documents and any unsaved draft on the same device. See recovering a document and Duplicate a document.

EV chargers on dwelling calculations

How much an EV charger counts for on a dwelling load calculation depends on the NEC edition your AHJ enforces. Nameplate means amps × volts. Multifamily and commercial calculations treat EV chargers differently and are not covered here.

NEC editionEV charger loadSection48 A at 240 V
2017, 2020Nameplate × 125%, as a continuous load625.42, 625.4114,400 VA
2023Larger of nameplate and 7,200 VA220.5711,520 VA
2026Nameplate, or 7,200 VA if there is no nameplate120.5711,520 VA

Change the charger size

Click the row's VA to pick another size. Every size is listed with and without the 125%; on 2020/23 Standard and the 2026 methods, the sizes without it come first. For a size that isn't listed, click the row's VA and choose Custom value at the bottom of the list.

Optional method: EV charging multiplier

The final calculation takes the EV charging load at 100% on its own line, not with the loads taken at 40%. If your AHJ wants something else, change EV charging multiplier in the final calculation.

On 2026 Optional for an existing dwelling, a new charger goes in with the new loads at 80% (Table 120.83). The multiplier applies to existing chargers.

Load shedding and load sharing

If a load shedder or a load sharing switch keeps the charger from adding to the peak, the shed load can come off the calculation. Click Add equipment and pick an EV charger load shedding size, or right-click the row of the load being shed and choose Insert load balancing line. Trim the negative line to the amount actually shed. With a load sharing switch, such as a dryer and charger on one circuit, reduce the smaller of the two loads. On the Standard methods, dryer, cooking and fixed-appliance rows don't offer a load balancing line.

A charger with a restricted ampere adjustment (NEC 2023 625.42(B)) goes on the calculation at its adjusted setting: a 48 A charger set to 32 A counts as a 32 A charger.

For the full rules and where they come from, see EV chargers and load calculations.

Frequently asked questions

Is the load calculator NEC compliant?

It's built using defaults and values from the NEC standard and optional calculation methods: Article 220 for the 2017 to 2023 editions, and Article 120 for NEC 2026.

The math is fixed formulas written from the code, so the same inputs always give you the same result. Kopperfield AI can add lines for you, but it never does the math. We test the formulas against worked examples and real calculations every time we change them. If we find a mistake that changed your result, we will fix it and let you know.

The calculator and the PDF show the NEC section behind each subtotal, so you or your inspector can follow the work.

A couple of things it doesn't do yet: the optional method on 3-phase services (use the standard method), and the existing-service calculation from measured maximum demand (220.87 / 120.87).

Always confirm what your AHJ requires. See our Terms of Service for more information.

Can I choose the NEC year?

Yes. On a commercial calculation, pick the edition in NEC version: 2017, 2020, 2023 or 2026. On a dwelling calculation, choose in Calculation method between the Standard and Optional methods based on the 2017 to 2023 editions (Article 220) and the 2026 versions (Article 120).

Why is my load calculation locked, and why can't I edit it?

On the free calculator, the final calculation stays blurred until you create a free account. In your dashboard, a free account can view and download a saved calculation, and Edit offers a one-time free edit for 3 hours (one per account). When the time is up the calculation locks again, with your work saved. Once it is used, the Edit button shows a lock and "You've used your one-time free edit. Upgrade to edit any time." Upgrading under Settings, then Subscription, unlocks editing and lets you create more than 2 calculations. See Free plan limits.

How do I add a load shedding or load management line?

Right-click an equipment line (not inside a field). If that line supports it, choose Insert load balancing line. For EV chargers, see EV chargers on dwelling calculations.

Can I make load calculations on my phone?

Yes. In the mobile app, go to Tools, then Load calculation. See Mobile app.

Can I start a load calculation from a photo of the panel?

Yes. Take a photo of the electrical panel with the breakers and circuit labels visible, then click Add photo at the top of the calculation. Pick a photo from the job or from another job, upload one from your computer, or take one with your phone, then click Read photo. Kopperfield reads the printed or handwritten labels and uses them to fill in your load calculation.

Review the imported lines to confirm everything is accurate and complete. Each line keeps a link to the photo, with the label it came from boxed on the picture, so you can compare it with the original and adjust anything that needs it. Photos you took with Camera in the mobile app are already on the job.

I'm adding an accessory dwelling unit (ADU). Do I enter the house and the ADU, or just the ADU?

The rules for ADUs (also called granny flats, in-law units, guest houses, casitas, coach houses, JADUs or DADUs) may depend on your AHJ, but in general, if the ADU has its own electrical service, make a separate calculation with only the ADU’s loads. If it’s fed from the house’s service, the house’s service carries all the load, so the calculation needs all of the loads as well:

  • Not a full dwelling unit (no cooking, sleeping and bathroom facilities of its own): leave Number of dwellings on Single dwelling and add the ADU's loads to the house's.
  • A full dwelling unit: set Number of dwellings to Duplex. Many users default to the Standard method and enter both units' loads. If the two units are close in size and load, the Optional method may be preferred. On the Optional method, enter only the larger unit’s loads, and the calculator works out the load for both.

Why does my EV charger row include 125%?

On the Optional and 2017 Standard methods, a new calculation's EV charger is 125% of nameplate, because most AHJs on NEC 2017 and 2020 treat it as a continuous load. NEC 2023 and 2026 don't add 125% in the load calculation, so 2020/23 Standard and the 2026 methods start at 7,200 VA without it, following NEC 2023 220.57 and NEC 2026 120.57. To change it, click the row's VA and pick a size without the 125%.

Was this helpful?

Can't find what you need? , or email support@kopperfield.com.